92. The drain and sewer for a residential building should be:

ansrbtn.jpg (1340 bytes) (a)  on the same lot

ansrbtn.jpg (1340 bytes) (b)  below the finish grade

ansrbtn.jpg (1340 bytes) (c)  inside only

ansrbtn.jpg (1340 bytes) (d)  outside only

93. What do you join a copper and galvanized pipe with?

ansrbtn.jpg (1340 bytes) (a)  threading them together

ansrbtn.jpg (1340 bytes) (b)  a brass adaptor fitting

ansrbtn.jpg (1340 bytes) (c)  soldering them together

ansrbtn.jpg (1340 bytes) (d)  the scoring of the copper pipe

94. You must test waste and vent piping with a:

ansrbtn.jpg (1340 bytes) (a)  5 foot head of water

ansrbtn.jpg (1340 bytes) (b) 10 foot head of water

ansrbtn.jpg (1340 bytes) (c)  running test

ansrbtn.jpg (1340 bytes) (d)  any of the above

95. Gas pipe which joins more than one building on any
      premise must have:

ansrbtn.jpg (1340 bytes) (a)  individual meters

ansrbtn.jpg (1340 bytes) (b)  earthquake valves

ansrbtn.jpg (1340 bytes) (c)   separate shutoff valves

ansrbtn.jpg (1340 bytes) (d)  only one meter

96. What should you connect different sized pipes with a?

ansrbtn.jpg (1340 bytes) (a)  bell reducer

ansrbtn.jpg (1340 bytes) (b)  union

ansrbtn.jpg (1340 bytes) (c)  bushing

ansrbtn.jpg (1340 bytes) (d)  nipple

97. What valve should be used to connect a main to
      a residential system if the pressure in a water supply
      main is over 80 pounds (psi)?

ansrbtn.jpg (1340 bytes) (a)   reducing valve

ansrbtn.jpg (1340 bytes) (b)  check valve

ansrbtn.jpg (1340 bytes) (c)  globe valve

ansrbtn.jpg (1340 bytes) (d)  gate valve

98. When on an asphalt shingle roof, what is the best kind
      of shoe to wear?

ansrbtn.jpg (1340 bytes) (a)  steel-toed boots

ansrbtn.jpg (1340 bytes) (b)  leather-soled boots

ansrbtn.jpg (1340 bytes) (c)  knee-high boots

ansrbtn.jpg (1340 bytes) (d)   rubber-soled shoes

99. The point where the roof of a gable dormer meets
       the main part of the roof is called a ?

ansrbtn.jpg (1340 bytes) (a)  ridge

ansrbtn.jpg (1340 bytes) (b)  hip

ansrbtn.jpg (1340 bytes) (c)  dormer

ansrbtn.jpg (1340 bytes) (d)  valley

100. When covering a shingle roof, what is the first step?

ansrbtn.jpg (1340 bytes) (a)  install the underlayment

ansrbtn.jpg (1340 bytes) (b)  install valley flashing

ansrbtn.jpg (1340 bytes) (c)  install eaves flashing along the rakes

ansrbtn.jpg (1340 bytes) (d)  seal the wood sheathing

101. How are asphalt shingles laid?

ansrbtn.jpg (1340 bytes) (a)  from both rakes to the center

ansrbtn.jpg (1340 bytes) (b)  from right rake to left rake

ansrbtn.jpg (1340 bytes) (c)  from the eaves to the ridge

ansrbtn.jpg (1340 bytes) (d)  from the ridge to the eaves

102. Liquid solar installation may result in "freezing up"
        due to:

ansrbtn.jpg (1340 bytes) (a)  leaky gaskets

ansrbtn.jpg (1340 bytes) (b)   inadequate pipe insulation

ansrbtn.jpg (1340 bytes) (c)  poorly soldered joints

ansrbtn.jpg (1340 bytes) (d)  use of inferior materials

103. In liquid solar collectors small passages may:

ansrbtn.jpg (1340 bytes) (a)  leak

ansrbtn.jpg (1340 bytes) (b)  act as a pressure drop component

ansrbtn.jpg (1340 bytes) (c)  make it easy to drain

ansrbtn.jpg (1340 bytes) (d)  become plugged

104. The water storage tank in a thermosiphon solar
         heating system is located:

ansrbtn.jpg (1340 bytes) (a)  no more than 1 foot above the collector

ansrbtn.jpg (1340 bytes) (b)  no more than 2 foot above the collector

ansrbtn.jpg (1340 bytes) (c)  only according to the season

ansrbtn.jpg (1340 bytes) (d)  2 feet below the collector

105. Individual collectors assembled in a group:

ansrbtn.jpg (1340 bytes) (a)  must be vented to filling

ansrbtn.jpg (1340 bytes) (b)  must be soldered to piping

ansrbtn.jpg (1340 bytes) (c)  must be fitted by individual mountings

ansrbtn.jpg (1340 bytes) (d)  must be attainable for replacement

106. Solar collectors on the ground must be:

ansrbtn.jpg (1340 bytes) (a)  set on concrete pads

ansrbtn.jpg (1340 bytes) (b)  laminated

ansrbtn.jpg (1340 bytes) (c)  facing the sun

ansrbtn.jpg (1340 bytes) (d)  set on secure palettes

107. For billing purposes structural steel is ordered by the:

ansrbtn.jpg (1340 bytes) (a)  lineal foot

ansrbtn.jpg (1340 bytes) (b)  pounds.

ansrbtn.jpg (1340 bytes) (c)  bundle

ansrbtn.jpg (1340 bytes) (d)  100 pounds

108. On a shower floor the ceramic tile should be installed:

ansrbtn.jpg (1340 bytes) (a)  to a wood subfloor

ansrbtn.jpg (1340 bytes) (b)  to a concrete subfloor

ansrbtn.jpg (1340 bytes) (c)  to a portland mortar bed

ansrbtn.jpg (1340 bytes) (d)  b or c

109. With 120 tiles per box, how many boxes of tile will be
        needed to cover a wall 6 feet by 10 feet using 6 inch
        square tiles :

ansrbtn.jpg (1340 bytes) (a)  2 boxes

ansrbtn.jpg (1340 bytes) (b)  4 boxes

ansrbtn.jpg (1340 bytes) (c)  6 boxes

ansrbtn.jpg (1340 bytes) (d)  8 boxes

 