92. The drain and sewer for a residential building should be:
(a) on the
same lot
(b) below the finish grade
(c) inside only
(d) outside only
93. What do you join a copper and galvanized pipe with?
(a) threading them together
(b) a brass
adaptor fitting
(c) soldering them together
(d) the scoring of the copper pipe
94. You must test waste and vent piping with a:
(a) 5 foot head of water
(b) 10 foot head
of water
(c) running test
(d) any of the above
95. Gas pipe which joins more than one building on any
premise must have:
(a) individual meters
(b) earthquake valves
(c)
separate shutoff valves
(d) only one meter
96. What should you connect different sized pipes with a?
(a) bell
reducer
(b) union
(c) bushing
(d) nipple
97. What valve should be used to connect a main to
a residential system if the pressure in a water supply
main is over 80 pounds (psi)?
(a)
reducing valve
(b) check valve
(c) globe valve
(d) gate valve
98. When on an asphalt shingle roof, what is the best kind
of shoe to wear?
(a) steel-toed boots
(b) leather-soled boots
(c) knee-high boots
(d)
rubber-soled shoes
99. The point where the roof of a gable dormer meets
the main part of the roof is called a ?
(a) ridge
(b) hip
(c) dormer
(d) valley
100. When covering a shingle roof, what is the first step?
(a) install
the underlayment
(b) install valley flashing
(c) install eaves flashing along the rakes
(d) seal the wood sheathing
101. How are asphalt shingles laid?
(a) from both rakes to the center
(b) from right rake to left rake
(c) from
the eaves to the ridge
(d) from the ridge to the eaves
102. Liquid solar installation may result in "freezing up"
due to:
(a) leaky gaskets
(b)
inadequate pipe insulation
(c) poorly soldered joints
(d) use of inferior materials
103. In liquid solar collectors small passages may:
(a) leak
(b) act as a pressure drop component
(c) make it easy to drain
(d) become
plugged
104. The water storage tank in a thermosiphon solar
heating system is located:
(a) no more than 1 foot above the collector
(b) no more
than 2 foot above the collector
(c) only according to the season
(d) 2 feet below the collector
105. Individual collectors assembled in a group:
(a) must be vented to filling
(b) must be soldered to piping
(c) must be
fitted by individual mountings
(d) must be attainable for replacement
106. Solar collectors on the ground must be:
(a) set on
concrete pads
(b) laminated
(c) facing the sun
(d) set on secure palettes
107. For billing purposes structural steel is ordered by the:
(a) lineal foot
(b) pounds.
(c) bundle
(d) 100
pounds
108. On a shower floor the ceramic tile should be installed:
(a) to a wood subfloor
(b) to a concrete subfloor
(c) to a portland mortar bed
(d) b or c
109. With 120 tiles per box, how many boxes of tile will be
needed to cover a wall 6 feet by 10 feet
using 6 inch
square tiles :
(a) 2 boxes
(b) 4 boxes
(c) 6 boxes
(d) 8 boxes