Contact Us

* Required Fields

C15 Floor Covering, Trade Only

Be the first to review this product

Quick Overview

C15-Flooring Contractors; prepares and installs carpet, vinyl sheets, resilient tiles, wood floors and flooring except ceramic tile.

* Required Fields

$199.00

More Views

Kit Includes

These ADD CONTRACTOR CLASSIFICATION KITs include the "Contractors Trade Course" required to add an additional California State License Classification to your existing license. KITs include the Study Manual with the lectures available on DVD, CD, or Both. KITs also include a Licensing Checklist, the Applications, and Hundreds of Practice Exam Questions with answers and explanations. You will also get access to our Online Exam Preparation Center from which you can test yourself repeatedly right up to the day of your State Exam. In addition, we will assist you and review your Application before you send it to the State. KITs may very base on the Lecture DVDs, CDs, Assistance, and Guarantee.

The following are KIT OPTIONS; 

$199 - Trade Manual, access to our Online Exam Preparation, NO Assistance, NO Guarantee, and NO Lectures on DVDs or CDs.

$229 - Trade Manual, access to our Online Exam Preparation, Application Assistance, 200% Guarantee, and Lectures on CDs.

$259 - Trade Manual, access to our Online Exam Preparation, Application Assistance, 200% Guarantee, and Lectures on DVDs.

$289 - Trade Manual, access to our Online Exam Preparation, Application Assistance, 200% Guarantee, and Lectures on DVDs and CDs.

You will have access to our Online Exam Preparation Center (Crash Course), where you can practice taking your exams repeatedly before you take the State Exam. We have so much confidence in our Study Material and our Online Exam Preparation Center we offer a 200% Money-Back Guarantee. These KITs are the fastest and easiest way to get your California State Contractors License. Our KITS are current, easy-to-use, and you can study at your own pace.

ORDER TODAY… Start your business tomorrow !!!

Description

Details

C15 - A flooring and floor covering contractor prepares any surface for the installation of flooring and floor coverings, and installs carpet, resilient sheet goods, resilient tile, wood floors and flooring (including the finishing and repairing thereof), and any other materials established as flooring and floor covering material, except ceramic tile.

Course Covers

1. PLANNING AND ESTIMATING (27%)
Evaluate plans and specifications
Evaluate material characteristics
Perform job-related calculations
Evaluate job site readiness

2. SUBFLOOR EVALUATION AND PREPARATION (15%)
Remove existing flooring
Evaluate and prepare subfloor for installation
Correct subfloor for installation
Test sub-floor for moisture
Install underlayments

3. CARPET INSTALLATION (11%)
Evaluate carpeting
Install tack strips, cushions, and trims
Cut and lay out carpet
Seam, seal, stretch, and tuck carpet

4. RESILIENT GOODS AND RUBBER FLOORING INSTALLATION (11%)
Evaluate sheet goods
Cut and/or lay out sheet goods for installation
Use adhesives
Prepare sub-floor for installation
Roll and seal sheet goods
Install trim moldings and transitions

5. LAMINATE FLOORING INSTALLATION (8%)
Evaluate laminates
Cut and lay out laminates
Install laminate and laminates trims and transitions

6. WOOD FLOORING INSTALLATION (14%)
Evaluate wood materials
Perform moisture tests
Cut and lay out wood
Install wood flooring and trims
Fill and sand wood
Finish wood

7. JOB SITE SAFETY (14%)
Apply personal safety procedures
Apply job safety procedures
Operate tools and equipment safely
Handle and dispose of products safely

Table of Contents

TABLE OF CONTENTS

Flooring and Floor Covering Contractor
Flooring and Floor Covering Overview
Math
Plans and Estimating
Jobsite Preparation
Carpet
Resilient Coverings
Laminate Floors
Hardwood Floors
Health and Safety Orders
Flooring and Floor Covering Review Questions

Sample Questions

1. When installing carpet on stairs, in which direction should the pile point?
a. Any direction
b. Toward the left
c. Up the stairs
d. Down the stairs *

2. What procedure should be used when the contractor finds a hump in the concrete substrate?
a. Install over it
b. Use more adhesive
c. Smooth the area with floor fill
d. Grind the hump down to level it *

3. Which of the following hardwood surface finishes would be BEST for kitchen floors?
a. Spar varnish
b. Acrylic wax
c. Low gloss varnish
d. Urethane *

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.